Commercial and industrial buildings are characteristic of the area for which this project ‒ based on design plans for the «Äussere Lorzenallmend» district ‒ was developed. Two construction phases are planned: During the first construction phase, an idiosyncratic, comb-like, three-story building volume is formulated and subsequently enhanced with a high point on Chollerstrasse. A spacious access ramp leading to a plateau opens up the new building. The two building wings enclose the entrance space.


- architects: Boltshauser Architekten
- Location: Chollerstrasse 26, 6301 Zug, Switzerland
- Project Year: 2021
- Photographs: Kuster Frey
- Area: 17900.0 m2