In this project, that chaixetmorel. realized together with real estate developer VINCI Immobilier, it was necessary to master the balancing act between preserving the existing building, creating suitable accommodation for the athletes, and then continuing to use it as offices for a ministry long after the athletes had left. Chaixetmorel. built a contemporary, innovative, and modern ensemble on an area of around 68,000m2 that houses apartments as well as service, training, and storage facilities. The architects succeeded in integrating the architecturally exciting industrial buildings from the beginning of the 20th century (the Maxwell Hall) and its engineering building (the Copernic Pavilion) into the new use. The campus is structured around them, along a strong east-west axis that forms the heart of the new site. A timber hybrid construction method was used for the new buildings. Many existing materials were reused on site (e.g. demolition concrete in the wire ballast boxes of the new plinth zone) or were taken from demolished buildings elsewhere and given a new life cycle (e.g. raised floors in the office areas). The CO2 footprint was already reduced by around 40% compared to similar projects during construction and will also result in significantly lower energy consumption during future use - first as an Olympic village and later as office space.
This website uses cookies to distinguish you from other users of our website. The use of cookies helps us to provide you with a specific service, to facilitate website use and to understand our visitors. By continuing to browse the site you are agreeing to our use of cookies.