House of Music and Theater / Arias Garrido Arquitectos

The volumetric formalization of the building, in interconnected autonomous pieces, responds to the need to solve two different programs: Auditorium and School of Music, with different needs but with a certain required programmatic link. Thus, a large volume is located at the north end of the plot that houses the auditorium and its related rooms: entrance foyer, dressing rooms, administration, rehearsal room, etc., and the rest of the smaller rooms that house the different classrooms from the music school. This volumetric atomization has a double intention: on the one hand, to escape as far as possible from a massive building, in a natural context in the park in which it is inserted, (still in execution), next to the banks of the Pisuerga river; and on the other hand to minimize the noise pollution between classrooms, so common in facilities of these characteristics. This subdivision originates open "patios" on one of its sides as an extension of the park itself that illuminates the connection corridor between classrooms.

House of Music and Theater / Arias Garrido Arquitectos
© RUHECA © RUHECA
  • architects: Arias Garrido Arquitectos
  • Location: 47195 Arroyo de la Encomienda, Valladolid, Spain
  • Project Year: 2021
  • Photographs: RUHECA
  • Area: 8980.0 m2

Read more »