Concert Hall at Kiel Castle Renovation and Conversion / gmp Architects + bbp : architekten

Renovation and Conversion into a Contemporary Orchestral Hall - The Concert Hall at Kiel Castle exemplifies the challenges faced by many cultural buildings of the post-war modern era, which today require functional and technical renewal while preserving their architectural identity. Between 2019 and 2025, a design team comprising gmp · Architects von Gerkan, Marg and Partners and bbp: architekten developed the project as a conceptual continuation of the existing building. The aim of the design was to integrate a wide range of new requirements into an existing structure whose quality derives largely from the clarity and formal restraint of its architecture.

Concert Hall at Kiel Castle Renovation and Conversion / gmp Architects + bbp : architekten
© Marcus Bredt © Marcus Bredt

Read more »