Mies van der Rohe design for Indiana architecture school is being built, 70 years later
Indiana University (IU) has shared an update of their Mies Building at the Eskenazi School of Art, Architecture + Design. The scheme, currently under construction, realizes a recently rediscovered 1952 design by Mies van der Rohe for the IU Bloomington campus. The scheme has been adapted for contemporary use by architects Thomas Phifer and Partners and is expected to open in the Fall of 2021. When completed, the Mies Building will be a 60-foot-wide, 140-foot-long rectangular structure of thin, white-painted steel and expansive glass with 10-square-foot panes. Floor-to-ceiling windows will wrap around the entire second story, which will feature a central exterior square atrium to enhance the building’s aura of transparency. Much of the lower level is external, with the main second story elevated above the ground. Exterior view of the northwest corner of the Eskenazi School of Art, Architecture + Design, a Mies van der Rohe Design, on the campus of Indiana University Bloomington. ...
Indiana University (IU) has shared an update of their Mies Building at the Eskenazi School of Art, Architecture + Design. The scheme, currently under construction, realizes a recently rediscovered 1952 design by Mies van der Rohe for the IU Bloomington campus. The scheme has been adapted for contemporary use by architects Thomas Phifer and Partners and is expected to open in the Fall of 2021.
When completed, the Mies Building will be a 60-foot-wide, 140-foot-long rectangular structure of thin, white-painted steel and expansive glass with 10-square-foot panes. Floor-to-ceiling windows will wrap around the entire second story, which will feature a central exterior square atrium to enhance the building’s aura of transparency. Much of the lower level is external, with the main second story elevated above the ground.