Secondary School in Herrischried / Spiecker Sautter Lauer Architekten

The two communities Rickenbach and Herrischried in the Black Forest region with a total of 6,600 residents, have joined forces to reorganise their school landscape. After winning the two design competitions in 2016, Spiecker Sautter Lauer Architects from Freiburg were commissioned to extend the existing school building in Rickenbach into a full-time primary school for both communities and to extend the existing school building in Herrischried into a secondary school for grades 5 to 10. The general increase in construction costs and problems with the supply of specific building products led to a longer planning and construction period. The building in Herrischried was completed in 2022.

Secondary School in Herrischried / Spiecker Sautter Lauer Architekten
© Yohan Zerdoun © Yohan Zerdoun
  • architects: Spiecker Sautter Lauer Architekten
  • Location: Sägestraße 17, 79737 Herrischried, Germany
  • Project Year: 2022
  • Photographs: Yohan Zerdoun
  • Photographs: Spiecker Sautter Lauer Architekten
  • Area: 2420.0 m2

Read more »